Ruijie Networks
Ruijie switch deployment
Baseline build and checks for a new access or core switch.
- Site
- Date
- Technician
- Reference
Baseline
- Firmware at the approved version (release notes read)
- Hostname, enable secret, named admin accounts
- Time zone and NTP; logging to syslog
- SSH enabled, Telnet disabled; management on the management VLAN
- SNMPv3 configured for monitoring
Switching
- VLANs created and named per the design
- Access ports in the correct VLAN with descriptions
- Trunks allow only required VLANs; native VLAN changed to unused
- Aggregate ports use LACP; settings on the AP interface
- Spanning-tree mode set; core is root; portfast and BPDU guard on edge ports
- Unused ports shut down and placed in the parking VLAN
Security and services
- DHCP snooping with uplinks trusted
- Port security on CCTV / building system ports in public areas
- Voice VLAN / LLDP-MED for IP phones
- QoS trust on phone ports; queues on uplinks
- PoE budget checked against connected devices
Finish
-
Configuration saved (
write) and backed up off-device - Serial number, firmware, and IP recorded in the site documentation
- Change logged with rollback plan
Notes / defects
Technician signature
Client / supervisor signature
Zi-On ELV Academy · https://elv.zioninnovates.com/toolkit/checklists/network-switch-deployment