Fire Detection & Alarm

Fire alarm weekly user test

For the building's responsible person (BS 5839-1).

Zi-On
Site
Date
Technician
Reference

Each week

  • Inform the alarm receiving centre and occupants before testing
  • Operate a different manual call point from last week
  • Confirm the panel shows the correct location
  • Confirm sounders operate throughout the building
  • Reset the panel and confirm it returns to normal
  • Inform the receiving centre the test is finished
  • Record the test and call point used in the logbook

Notes / defects

Technician signature

Client / supervisor signature